Case studies
We work across a range of industries including hospitality, education, professional services, healthcare, data tech, and even cover the national grid. We can work with budgets from £100,000 to multi million pound spends.
We work across a range of industries including hospitality, education, professional services, healthcare, data tech, and even cover the national grid. We can work with budgets from £100,000 to multi million pound spends.
We work across a range of industries including hospitality, education, professional services, healthcare, data tech, and even cover the national grid. We can work with budgets from £100,000 to multi million pound spends.
Two-story 32MW DC
On site 100MVA multi-fuel generation plant
The works comprised:
First of a kind design details
Access constraints due to large generators
Non standard installation methodology for installing beam encasement and white wall
Helping the client in achieving zero plastic to landfill. The first project to do so in Ireland and the UK
€4.5m
New Build 40MW Data Centre
1m SqFt Campus
The full works comprised:
Remote location (Northern Sweden)
Adverse weather conditions exceeding -30°C
Extreme daylight hours with 24hrs darkness or daylight
Operating during global pandemic
SEK 33m
Three-story 13.6 MW DC
Fire Stopping
Cable Transit Systems
Non-standard busbar and damper details needed solutions which were developed in liaison with the fire officer, and signed off by 3rd party
Working in confined spaces under raised access floor
Tight spacial constraints on site
€700k
Refurbishment 15,000 ft2 of level 4 of 2 Atlantic Square, Glasgow
The full works comprised:
City Centre Location
Manual Handling to Level 4
£150k
New Build Energy from Waste Plant
The full works comprised:
Multiple GC’s
Delays with construction of external envelope
Working at height (up to 20m)
Working adjacent to petrochemical plant
£915k
New Build Campus - €10m subcontract package
The full works comprised:
Brexit, Work Permits & Forming a Permanent Establishment in Belgium
€9.2m
Refurbishment of 72 En Suite Rooms & 8 cluster Kitchens
The full works comprised:
Condensed Program
Confined working areas
£250k
New Build Electrical Converter Stations
First multi-terminal HVDC interconnection in Europe
The full works comprised:
Multiple trades operating in confined spaces
Access issues due to plant size
Rope Access Firestoppers required
Planning and Coordinating trade synergy
£498k