Some of our key highlights

Vantage DUB11

Multi Fuel Generation Plant
Description

Two-story 32MW DC
On site 100MVA multi-fuel generation plant
The works comprised:

  • Beam encasement & structural fire protection
  • White wall
  • Constructions of new partitions, suspended ceilings & plasterboard ceilings
  • Raised access floor
  • Firestopping
  • Doors

Challenges

First of a kind design details
Access constraints due to large generators
Non standard installation methodology for installing beam encasement and white wall
Helping the client in achieving zero plastic to landfill. The first project to do so in Ireland and the UK

Project Value

€4.5m

Meta

Data Centre
Description

New Build 40MW Data Centre
1m SqFt Campus
The full works comprised:

  • Cable transit systems
  • Air integrity sealing
  • Firestopping
  • Fire rated Movement Joints

Challenges

Remote location (Northern Sweden)
Adverse weather conditions exceeding -30°C
Extreme daylight hours with 24hrs darkness or daylight
Operating during global pandemic

Project Value

SEK 33m

Digital Realty

Data Centre
Description

Three-story 13.6 MW DC
Fire Stopping
Cable Transit Systems

Challenges

Non-standard busbar and damper details needed solutions which were developed in liaison with the fire officer, and signed off by 3rd party
Working in confined spaces under raised access floor
Tight spacial constraints on site

Project Value

€700k

Burness Paul LLP

Commercial Offices
Description

Refurbishment 15,000 ft2 of level 4 of 2 Atlantic Square, Glasgow
The full works comprised:

  • Strip out works
  • Construction of new partitions, refitting suspended ceilings, plasterboard ceilings, skirtings, facings
  • Joinery work
  • Firestopping
  • New flooring, kitchens, screens, doors, partitions, blinds, manifestations
  • Bespoke manufactured joinery

Challenges

City Centre Location
Manual Handling to Level 4

Project Value

£150k

Earls Gate EFW

Waste Plant
Description

New Build Energy from Waste Plant
The full works comprised:

  • Beam Encasement & Structural Fire Protection
  • Construction of new partitions, suspended ceilings & plasterboard ceilings
  • Air integrity sealing
  • Firestopping

Challenges

Multiple GC’s
Delays with construction of external envelope
Working at height (up to 20m)
Working adjacent to petrochemical plant

Project Value

£915k

Bristol Myers Squibb

Biopharmaceutical Facility
Description

Fire Stopping

Challenges

Ensuring compliance with FM Global
Heavily serviced building, resulting in special restrictions whilst undertaking works

Project Value

€500k

Google

Data Centre
Description

New Build Campus - €10m subcontract package
The full works comprised:

  • Cable transit systems
  • Air integrity sealing
  • Firestopping
  • Fire rated Movement Joints
  • Slab Edge Junctions
  • Structural Cladding & Fire Protection
  • BIM Modelling, Builderswork Drawings, Fire Test, Detail Development

Challenges

Brexit, Work Permits & Forming a Permanent Establishment in Belgium

Project Value

€9.2m

AMS Campus, Microsoft

Data Centre
Description

Service Penetrations Through Eurobond Whitewall, Concrete Slab,  Non-Fire Rated Walls
Movement Joint
EZ Paths

Challenges

Obtaining 3rd Party assessments to ensure a compliant solution could be offered to the client

Project Value

€2.4m

Equinix

Data Centre
Description

Fire Stopping

Challenges

Compliance with in country labour and HSE regulations

Project Value

€1.2m

Heriot Watt University

Student Accommodation
Description

Refurbishment of 72 En Suite Rooms & 8 cluster Kitchens
The full works comprised:

  • Strip out works
  • Construction of new partitions, refitting suspended ceilings, plasterboard ceilings, skirtings, facings
  • Joinery work
  • Kitchens
  • Doors
  • Firestopping

Challenges

Condensed Program
Confined working areas

Project Value

£250k

Dogger Bank, National Grid

Converter Station
Description

New Build Electrical Converter Stations
First multi-terminal HVDC interconnection in Europe
The full works comprised:

  • Beam Encasement & Structural Fire Protection
  • Air integrity sealing
  • Firestopping

Challenges

Multiple trades operating in confined spaces
Access issues due to plant size
Rope Access Firestoppers required
Planning and Coordinating trade synergy

Project Value

£498k